Feasibility Study for HPP Babino Selo

The Public Enterprise „Electric Utility of Bosnia and Herzegovina“ (EP BiH) is planning to construct a hydropower plant (HPP) on the Vrbas River in line with its strategy for efficient use of hydro resources and the development of new renewable energy capacities. The aim of the assignment is the development of a Feasibility Study, which includes an Environmental and Social Impact Assessment (ESIA) in line with local legislation and EU standards. The Feasibility Study will allow EPBIH and international finance institutions to assess the Project for further realisation and will further constitute a sound basis for the preparation of the preliminary design and tender documents.

Funded by: EBRD

Country: Bosnia and Herzegovina

Year: 2015 – 2017